- The headline force in a catalog is the seated force, measured with the gap closed.
- Your load is lifted at the far end of the travel, where the same coil is at its weakest.
- Duty cycle, the return spring and a warm coil all pull the usable curve down again.
A solenoid force-stroke curve plots the force a DC linear actuator produces at every plunger position, from fully extended to seated against the pole piece. Force rises steeply as the gap closes. Size the unit at the position where your load starts to resist, never at the catalog peak.
What does a solenoid force-stroke curve show?
It shows force on the vertical axis against plunger position on the horizontal one. The left of the chart is the plunger at rest, with the full working gap still open. The right is the closed position, where the plunger has seated. One curve, one coil, one voltage.
Two solenoids with the same rated force can behave differently in the same machine, because that rating describes one point on the curve rather than the whole line. The shape between those two ends is what your mechanism actually experiences, and the shape is set by the plunger, the pole piece and the gap.
Why is the force weakest at the start of the stroke?
Because the air gap is at its largest there. Air carries flux poorly compared with steel, so a wide gap starves the magnetic circuit and the pull stays low. As the plunger closes that gap, flux density climbs and force climbs with it, which is why the curve turns sharply upward near the seated position.
This is the single most expensive misreading in a solenoid enquiry. A buyer sizes on the catalog figure, the sample arrives, and the plunger will not even start to move the load from rest. Nothing is faulty. The load simply sat at the weak end of a curve that was published at the strong end.
Where do you read your own working point?
Find the plunger position where your load first resists, then read the force directly above it. For most mechanisms that position is the start of travel, with the whole stroke still to go. If the resistance appears part way along, such as a spring that only contacts at mid travel, read the curve there instead.
The dot on the diagram above marks a working point 8mm out on a 10mm stroke, and it sits below the load line. That unit will hum and stay put. Moving the same load needs a bigger body, a shorter stroke, a different plunger end, or a mechanism that takes the load later in the travel.
Stroke is measured from rest to the seated position, so shortening the mechanical travel is often the cheapest fix available. Halving the stroke moves your working point into the steep part of the same curve. A linkage change costs a drawing revision. A larger solenoid costs a new tool, more panel space and more heat. Stroke is the first of six specs to settle in order, and the rest follow from it.
What has to be subtracted before the load moves?
Three things come off the curve before the load sees anything. The return spring works against the coil for the whole inward stroke. Friction in the bearing and any guide bush takes its share. Side load from a misaligned linkage adds more friction still, and it grows as the plunger extends.
Draw the load line on the chart as load plus spring plus friction, not load alone. The curve has to clear that line at every position the plunger passes through, not just at the end. Where the two lines cross is where motion stops, which is worth knowing before a sample is cut rather than after.

Gravity belongs in the same sum whenever the axis is not horizontal. A vertical push has to lift the plunger, the shaft and the load, while a vertical pull gets that weight for free on the way in and pays for it on the way back. State the mounting angle in the enquiry.
How does the plunger end change the shape?
The end profile trades peak force against long travel force. Published tubular practice puts flat ends on short strokes of roughly 3mm and under, where the steep rise near the seat is exactly what the mechanism wants. Conical and stepped ends flatten the curve, giving more force out at distance and less once seated.
Pick the profile from the job, not from the headline number. A part ejector that has to start a load 10mm out is better served by a flatter curve, even though its catalog peak looks smaller. A latch that only travels 2mm wants the steep flat-end curve and the high seated force that comes with it.
Body size sets the ceiling for both. Standard bodies in our range of tubular and open frame solenoid sizes run from under 15mm to about 90mm in diameter, with strokes up to about 35mm for tubular bodies and about 25mm for open frame. Plunger end, stroke and shaft are machined to order.
How does duty cycle move the whole curve down?
Duty cycle sets how much power the coil may take, and power sets force, so the curve keeps its shape and slides down. A body rated at 10% ED gives roughly a third of that peak when it runs continuously, and about 60% at 25% ED. Those are catalog estimates rather than measurements.
Read the curve that matches the rating you will actually run. A curve published at 10% ED describes a short pulse and a cold coil, which is a fair description of an ejector and a poor description of a latch that stays energized all shift.
Catalog curves and duty cycle ratings assume rated voltage at the terminals, a coil starting at 20°C, a cycle time of five minutes or less, no side load, and a static measurement with the plunger held at each position. Coils here are wound on a bobbin with Class B insulation. A hot coil draws less current than a cold one at the same voltage, so the working curve late in a shift sits below the published one.
How do you compare curves from two suppliers?
Check the conditions before you compare the lines. Voltage, duty cycle rating, coil starting temperature and whether the figures are static or measured in motion all change the result, and a curve is only comparable with another curve drawn under the same four conditions. Ask for them in writing when they are missing.
Then compare at your working position rather than at the peak. Two suppliers can quote the same seated force while one of them gives twice the force at 8mm. Force-stroke, temperature rise and life are all covered by force-stroke testing on new designs when a body is released, and the curve for a custom build comes from that release data.
One more comparison is worth making before any of this. If the job is to clamp a steel part rather than move it, the stroke is zero and the whole curve is beside the point. Start from electromagnet holding force calculation instead, and treat the solenoid as the wrong family of part.
How we checked this
This guide draws on published engineering practice for DC linear solenoids, on standard catalog rating conditions, and on what this factory builds: tubular and open frame bodies, machined plunger ends, spring return and made-to-order stroke. The diagram is drawn to illustrate curve shapes; its axes are percentages of seated force, and it carries no model, no newtons and no measured points. The duty cycle factors and size bands repeat the catalog ratings already published on our solenoid page. We did not measure force, friction, side load or coil temperature for this article, so no figure here is a Lodegrip test result. Written 25 September 2026.
Force-stroke curve FAQ
Why is my solenoid strong at the end of travel and weak at the start?
That is normal behavior, not a fault. Force follows the air gap: wide gap, low force. The pull grows as the plunger closes on the pole piece and peaks when it seats. Catalog ratings usually quote that seated figure, so a unit sized on it can stall at rest.
Can a long travel solenoid keep its force over the whole stroke?
No DC solenoid holds a flat curve across a long stroke. A conical or stepped plunger end flattens it, and a larger body raises the whole line, but force still falls as the gap opens. Long strokes with a high starting load are usually better served by a linkage that trades travel for force.
Is the force-stroke curve measured hot or cold?
Published curves normally assume a coil starting at 20°C at rated voltage. A coil that has been cycling all shift is warmer, its resistance is higher, and it draws less current at the same voltage, so the real curve sits below the printed one. Size with margin for that.
What is the difference between holding force and the force on the curve?
Holding force describes a clamp with the gap already closed and no travel at all. The force-stroke curve describes an actuator moving through a gap. Both come from DC coils in steel, but a holding electromagnet is specified by pole face, steel thickness and finish rather than by stroke.
Does a lower supply voltage change the curve?
Yes, and more than most buyers expect. Force in a DC solenoid follows coil power, so a sagging supply or a long thin cable lowers the whole line. Quote the voltage measured at the solenoid terminals under load, not the nominal panel voltage.
Can you supply a force-stroke curve for a custom solenoid?
Yes. A curve is produced from the type test data for the body a custom design is based on, and it is issued with the sample rather than promised in advance. Usual terms apply: 50 pieces minimum, samples in about 10 to 12 days and production in about 25 days.
Not sure which point on the curve your machine needs?
Send the stroke, the force needed at the start of that stroke, the duty cycle and the supply voltage at the terminals. Say whether the unit pushes or pulls, or read choosing push or pull action first. An engineer will review your stroke and force against the curve before anything is built.
Foshan factory since 1992 · ISO 9001 certified factory · MOQ 50 pcs · samples in 10 to 12 days